{"id":1111,"date":"2026-11-25T09:00:00","date_gmt":"2026-11-25T14:00:00","guid":{"rendered":"https:\/\/quickestimate.io\/blog\/?p=1111"},"modified":"2026-11-25T09:00:00","modified_gmt":"2026-11-25T14:00:00","slug":"how-to-estimate-a-roofing-job","status":"publish","type":"post","link":"https:\/\/quickestimate.io\/blog\/how-to-estimate-a-roofing-job\/","title":{"rendered":"How to Estimate a Roofing Job by the Square"},"content":{"rendered":"<p>To <strong>estimate a roofing job<\/strong>, measure the roof&#8217;s footprint, multiply by the pitch factor to get the real roof area, convert it to squares, and add a waste allowance. Then price materials and labor, add overhead, and set the price for your margin. Roofing is priced by the square, and a roofing square is 100 square feet of roof surface.<\/p>\n<div class=\"qe-takeaways\" style=\"background:#f6f4ef;border-left:4px solid #e8691c;padding:18px 22px;margin:24px 0;border-radius:6px\">\n<p><strong>Key takeaways<\/strong><\/p>\n<ul>\n<li>A roofing square is 100 square feet of roof surface.<\/li>\n<li>Multiply the footprint by the pitch factor before converting to squares.<\/li>\n<li>Add waste for cuts, hips, valleys and ridges, based on your past jobs.<\/li>\n<li>Include every extra: underlayment, starter, ridge cap, drip edge, flashing and vents.<\/li>\n<li>Price labor at its true cost, then add overhead and price for your margin.<\/li>\n<\/ul>\n<\/div>\n\n<h2 id=\"footprint\"><span class=\"ez-toc-section\" id=\"1_Measure_the_footprint\"><\/span>1. Measure the footprint<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Measure the length and width of the area the roof covers, including the overhangs. For a simple rectangle, multiply them. For more complex roofs, split the roof into rectangles and triangles, work out each one, then add them up.<\/p><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_85 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/quickestimate.io\/blog\/how-to-estimate-a-roofing-job\/#1_Measure_the_footprint\" >1. Measure the footprint<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/quickestimate.io\/blog\/how-to-estimate-a-roofing-job\/#2_Adjust_for_the_pitch\" >2. Adjust for the pitch<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/quickestimate.io\/blog\/how-to-estimate-a-roofing-job\/#3_Convert_to_squares_and_add_waste\" >3. Convert to squares and add waste<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/quickestimate.io\/blog\/how-to-estimate-a-roofing-job\/#4_List_all_the_materials\" >4. List all the materials<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/quickestimate.io\/blog\/how-to-estimate-a-roofing-job\/#5_Work_out_labor_at_your_true_cost\" >5. Work out labor at your true cost<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/quickestimate.io\/blog\/how-to-estimate-a-roofing-job\/#6_Add_overhead_then_price_for_your_margin\" >6. Add overhead, then price for your margin<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/quickestimate.io\/blog\/how-to-estimate-a-roofing-job\/#Worked_example_re-roofing_a_612_ranch_house\" >Worked example: re-roofing a 6\/12 ranch house<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/quickestimate.io\/blog\/how-to-estimate-a-roofing-job\/#Common_roofing_estimating_mistakes\" >Common roofing estimating mistakes<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/quickestimate.io\/blog\/how-to-estimate-a-roofing-job\/#Frequently_asked_questions\" >Frequently asked questions<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/quickestimate.io\/blog\/how-to-estimate-a-roofing-job\/#Price_your_next_roof_with_QuickEstimate\" >Price your next roof with QuickEstimate<\/a><\/li><\/ul><\/nav><\/div>\n\n<p>Aerial measurement reports are an alternative when you can&#8217;t safely get on the roof.<\/p>\n<h2 id=\"pitch\"><span class=\"ez-toc-section\" id=\"2_Adjust_for_the_pitch\"><\/span>2. Adjust for the pitch<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A sloped roof has more surface than its footprint. Multiply the footprint by the pitch factor to get the actual roof area.<\/p>\n<p><strong>Pitch factor = \u221a(12\u00b2 + rise\u00b2) \u00f7 12<\/strong><\/p>\n<table style=\"width:100%;border-collapse:collapse;margin:16px 0;font-size:15px\">\n<thead>\n<tr>\n<th style=\"text-align:left;padding:10px 12px;background:#1b2a4a;color:#fff;border:1px solid #1b2a4a\">Pitch<\/th>\n<th style=\"text-align:left;padding:10px 12px;background:#1b2a4a;color:#fff;border:1px solid #1b2a4a\">Pitch factor<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">4\/12<\/td>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">1.054<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">6\/12<\/td>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">1.118<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">8\/12<\/td>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">1.202<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">10\/12<\/td>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">1.302<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">12\/12<\/td>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">1.414<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The free <a href=\"https:\/\/quickestimate.io\/roofing-calculator\/\">roofing calculator<\/a> does this conversion for any pitch.<\/p>\n<h2 id=\"squares\"><span class=\"ez-toc-section\" id=\"3_Convert_to_squares_and_add_waste\"><\/span>3. Convert to squares and add waste<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Divide the roof area by 100 to get squares. Then add a waste allowance for cuts, starter rows, hips, valleys and ridges. Simple gable roofs need less waste than cut-up roofs with lots of hips and valleys. Use what your past jobs needed.<\/p>\n<p>Then convert squares to bundles. For example, Owens Corning lists <a href=\"https:\/\/www.owenscorning.com\/en-us\/roofing\/shingles\/duration\" target=\"_blank\" rel=\"dofollow noopener\">3 bundles per square<\/a> for its Duration shingles. Always check the coverage on the product you&#8217;re buying.<\/p>\n<h2 id=\"materials\"><span class=\"ez-toc-section\" id=\"4_List_all_the_materials\"><\/span>4. List all the materials<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Shingles are only part of it. Include:<\/p>\n<ul>\n<li>Underlayment and ice and water barrier where needed<\/li>\n<li>Starter strip and ridge cap<\/li>\n<li>Drip edge and flashing<\/li>\n<li>Vents<\/li>\n<li>Nails and sealant<\/li>\n<li>Replacement decking, priced as an allowance if you can&#8217;t see it yet<\/li>\n<\/ul>\n<h2 id=\"labor\"><span class=\"ez-toc-section\" id=\"5_Work_out_labor_at_your_true_cost\"><\/span>5. Work out labor at your true cost<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Estimate the crew hours for tear-off, deck repair, underlayment, installation and cleanup. Then use your true cost per hour.<\/p>\n<p>According to the <a href=\"https:\/\/www.bls.gov\/ooh\/construction-and-extraction\/roofers.htm\" target=\"_blank\" rel=\"dofollow noopener\">US Bureau of Labor Statistics<\/a>, the median pay for roofers was $26.65 an hour in May 2025. Employers also pay payroll taxes, insurance and benefits, which averaged 30% of total compensation across private industry in June 2026 (<a href=\"https:\/\/www.bls.gov\/news.release\/ecec.nr0.htm\" target=\"_blank\" rel=\"dofollow noopener\">BLS<\/a>). Dividing by the 70% wage share gives:<\/p>\n<p><strong>$26.65 \u00f7 0.70 = $38.07 an hour<\/strong><\/p>\n<p>Your own workers&#8217; compensation rate for roofing makes a big difference here, so check your real figure. The free <a href=\"https:\/\/quickestimate.io\/employee-cost-calculator\/\">employee cost calculator<\/a> works out your real figure.<\/p>\n<h2 id=\"margin\"><span class=\"ez-toc-section\" id=\"6_Add_overhead_then_price_for_your_margin\"><\/span>6. Add overhead, then price for your margin<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Add your overhead percentage to materials and labor, then price for your margin:<\/p>\n<p><strong>Price = total cost \u00f7 (1 \u2212 margin)<\/strong><\/p>\n<p>Pass-through costs like the dumpster and permit can be added at cost after this step.<\/p>\n<h2 id=\"example\"><span class=\"ez-toc-section\" id=\"Worked_example_re-roofing_a_612_ranch_house\"><\/span>Worked example: re-roofing a 6\/12 ranch house<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>These are example figures to show how to estimate a roofing job with this method. Use your own measurements, supplier prices and rates.<\/p>\n<p><strong>Measuring:<\/strong> the footprint with overhangs is 40 ft by 30 ft, or 1,200 sq ft. At a 6\/12 pitch: 1,200 \u00d7 1.118 = 1,341.6 sq ft, or 13.42 squares. With a 10% waste allowance that&#8217;s 14.76 squares, so you order 15 squares, which is 45 bundles.<\/p>\n<table style=\"width:100%;border-collapse:collapse;margin:16px 0;font-size:15px\">\n<thead>\n<tr>\n<th style=\"text-align:left;padding:10px 12px;background:#1b2a4a;color:#fff;border:1px solid #1b2a4a\">Item<\/th>\n<th style=\"text-align:left;padding:10px 12px;background:#1b2a4a;color:#fff;border:1px solid #1b2a4a\">Amount<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">Shingles: 45 bundles at $40<\/td>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">$1,800.00<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">Underlayment, starter, ridge cap, drip edge, vents and nails<\/td>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">$650.00<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea;font-weight:700;background:#f6f4ef\">Materials<\/td>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea;font-weight:700;background:#f6f4ef\">$2,450.00<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">Labor: 48 crew hours at $38.07<\/td>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">$1,827.36<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea;font-weight:700;background:#f6f4ef\">Materials and labor<\/td>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea;font-weight:700;background:#f6f4ef\">$4,277.36<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">Overhead at 18%<\/td>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">$769.92<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea;font-weight:700;background:#f6f4ef\">Total cost<\/td>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea;font-weight:700;background:#f6f4ef\">$5,047.28<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">Price for a 25% margin: $5,047.28 \u00f7 0.75<\/td>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">$6,729.71<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">Dumpster, passed through at cost<\/td>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">$500.00<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">Permit, passed through at cost<\/td>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea\">$150.00<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea;font-weight:700;background:#f6f4ef\">Price to the homeowner<\/td>\n<td style=\"padding:9px 12px;border:1px solid #e1e4ea;font-weight:700;background:#f6f4ef\">$7,379.71<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>That works out to about $550 per square of roof. Your profit is $1,682.43, which is 25% of the $6,729.71 before the pass-through costs.<\/p>\n<h2 id=\"mistakes\"><span class=\"ez-toc-section\" id=\"Common_roofing_estimating_mistakes\"><\/span>Common roofing estimating mistakes<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li><strong>Pricing from the footprint<\/strong> without the pitch factor.<\/li>\n<li><strong>Not enough waste<\/strong> on roofs with hips and valleys.<\/li>\n<li><strong>Forgetting the extras<\/strong>: ridge cap, starter, drip edge, flashing and vents.<\/li>\n<li><strong>No decking allowance<\/strong> for rot you find after tear-off.<\/li>\n<li><strong>Pricing labor at the wage<\/strong>, without taxes, insurance and workers&#8217; comp.<\/li>\n<\/ul>\n<h2 id=\"faq\"><span class=\"ez-toc-section\" id=\"Frequently_asked_questions\"><\/span>Frequently asked questions<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3>How many square feet is a roofing square?<\/h3>\n<p>A roofing square is 100 square feet of roof surface.<\/p>\n<h3>How do I calculate roofing squares?<\/h3>\n<p>Multiply the footprint by the pitch factor to get the roof area, divide by 100, then add your waste allowance.<\/p>\n<h3>How many bundles are in a square?<\/h3>\n<p>It depends on the shingle. Owens Corning lists 3 bundles per square for its Duration shingles, for example. Always check the coverage listed for the product you use.<\/p>\n<h3>What should a roofing estimate include?<\/h3>\n<p>The measured squares, all materials, tear-off and disposal, labor, any decking allowance, permits, and your overhead and profit. List exclusions too.<\/p>\n<h2 id=\"quickestimate\"><span class=\"ez-toc-section\" id=\"Price_your_next_roof_with_QuickEstimate\"><\/span>Price your next roof with QuickEstimate<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>QuickEstimate adds your overhead and margin to every estimate, and sends a proposal your client can approve and sign online. It doesn&#8217;t measure roofs or do takeoffs. Use the free roofing calculator for squares. <a href=\"https:\/\/quickestimate.io\/roofing-estimating-software\/\">See how it works for roofers<\/a>, or <a href=\"https:\/\/quickestimate.io\/signup\/\">start free<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Measure the roof, convert to squares with the pitch factor, add waste, then price shingles, labor, overhead and margin. A full re-roof worked example.<\/p>\n","protected":false},"author":1,"featured_media":1110,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[],"class_list":["post-1111","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-contractor-guides"],"_links":{"self":[{"href":"https:\/\/quickestimate.io\/blog\/wp-json\/wp\/v2\/posts\/1111","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/quickestimate.io\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/quickestimate.io\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/quickestimate.io\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/quickestimate.io\/blog\/wp-json\/wp\/v2\/comments?post=1111"}],"version-history":[{"count":1,"href":"https:\/\/quickestimate.io\/blog\/wp-json\/wp\/v2\/posts\/1111\/revisions"}],"predecessor-version":[{"id":1121,"href":"https:\/\/quickestimate.io\/blog\/wp-json\/wp\/v2\/posts\/1111\/revisions\/1121"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/quickestimate.io\/blog\/wp-json\/wp\/v2\/media\/1110"}],"wp:attachment":[{"href":"https:\/\/quickestimate.io\/blog\/wp-json\/wp\/v2\/media?parent=1111"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/quickestimate.io\/blog\/wp-json\/wp\/v2\/categories?post=1111"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/quickestimate.io\/blog\/wp-json\/wp\/v2\/tags?post=1111"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}